A selection of the work we’ve delivered across the UK’s critical infrastructure — from live network upgrades to complete new-build installations.
-
Rebuilding an entire compressor station within a single planned outage
One of the largest projects in our history, delivered safely and on programme.
-
Thameslink Core Resignalling Programme
- 118
- signals commissioned
- 42km
- of lineside cabling
- 54
- possessions, zero overruns
Design, installation and commissioning of ETCS-ready signalling through the Thameslink core, delivered across 54 midweek-night and weekend possessions without a single service-affecting overrun.
-
M62 Smart Motorway Technology Upgrade
- 96
- gantry signs connected
- 31km
- of ducting and cabling
- 400+
- roadside devices tested
Installation and integration of gantry-mounted signs, signals and CCTV across 31km of live smart motorway, including the complete power and communications backbone that supports them.
-
Creyke Beck 275kV Substation Refurbishment
- 275kV
- switchgear replaced
- 18
- month programme
- 0
- lost-time incidents
Phased replacement of life-expired 275kV switchgear, protection and control systems at a strategically critical transmission substation, delivered with the site live throughout.
-
Port of Felixstowe Quay Crane Electrification
- 11
- cranes converted to electric
- 6.6kV
- HV network installed
- 38%
- reduction in terminal carbon
Design and build of a new 6.6kV high-voltage distribution network to convert eleven diesel rubber-tyred gantry cranes to full electric operation at the Port of Felixstowe.
-
Elizabeth Line Tunnel Ventilation Control System
- 21km
- of twin-bore tunnel
- 14
- ventilation shaft sites
- 24/7
- commissioning coverage
Installation, integration and commissioning of the tunnel ventilation control system across the Elizabeth line’s central section, covering fourteen shaft sites and both running tunnels.
-
Dogger Bank Onshore Grid Connection
- 3.6GW
- of generating capacity connected
- 30km
- onshore HV cable route
- 2
- converter stations connected
Civils and high-voltage cable installation for the onshore transmission route connecting Dogger Bank offshore wind farm to the national grid, including ducting, jointing bays and two converter station connections.
No projects found.
Showing 7 of 7 projects
Your project could be next
Every project starts with a conversation about what you’re trying to achieve. If you’ve got something on the horizon — defined or not — we’re keen to hear about it.
Work with us
Whether it’s a defined scope, a framework enquiry, or a problem you’re still working through, we’re keen to hear from you. Early conversations are where we do our best work.